KAVIAN GOHAR SIRJAN 1.25 MT/Y Pelletizing Project
Previous slide
Next slide
Project SummaryCurrent StatusProject TimelineProject Status
Due to the Broad Range of Hematite-Magnetite Mixture Feed to This Pelletizing Plant a Flexible Process Must Be Designed to Meet The Requirement. So, to Increase The Pace of The Project The Technology, the Basic Design, and the Detail Design of the Induration Area have been Done by Newfer and The Rest Has Been Done by Kimia Sanat Spadana.
The Engineering and Design Phase Has Been Completed.
RFK was Selected as a Client Consultant in Dec. 2021 and It is Foreseen That the Project Will Be Started in July 2024