CHADORMALOU Transfer And Storage Of Iron Concentrate Project
ARDAKAN Pelletizing Plant Has an Open Storage Area of Iron Concentrate. The Maximum Wind Velocity in that area is 148 Km/h, Within 10-20 Meters From The Ground Level.
In order to prevent the loss of Iron Ore Concentrate, as a short-term solution Molasses was Used which was not effective. As a long-term solution Covered Storage for Concentrate Was Proposed by the Client.
4 Silos and Mixers were Designed to Enhance the Quality of Concentrate by Mixing Different Concentrate and Monitoring the Humidity.
Waiting for the Client Signal to start the Contractor Selection Bid.
Design Project Started in August 2021 and Completed in March 2021. Contactor Selection Tender Documents Submitted by RFK at That Time and Construction Duration is Foreseen to be About 18 Months After the Effective Date of Contact.