Design Of Material Storage And Handling, Steel Making, AHWAZ STEEL NATIONAL GROUP (800,000 Tons/Y)
The Engineering and Design Phase Has Been Completed.
18 Set Of Belt Conveyors, 13 Buildings, 5 Truck Loading Chutes, 6 Silos, 7 Sets of Two-Way Chutes and All Connecting Chutes and Ducting Related to Dust Collection System. Including Following Services: Site Study, Conceptual Design, Preparation of Alternatives and Modifications for Storage And Material Charge of Smelting. Basic Design, Layout, and Process Flow Diagrams for Conveyors. Calculation Book for Conveyors. All Drawings Related to Assembly Drawings, Loading Plans, Layout of Rollers and Switches, and All Other Parts Drawings. Building Drawings, Loading, Stairways, and Openings. Details of Shop Drawings for Connecting and Two-Way Chutes. Details of Silos Shop Drawings. Details of Hoppers Shop Drawings. Ducting Calculation and Detail Drawings of Dust Removal Ducting. Calculation Book And Drawings of Foundation and Ramp for Truck Loading. Issue of All Technical Procurement Documents Like Motor, Gearbox, Coupling, Rollers, Bearing and Housings, Belts, Switches, and Actuators – Clarification of Technical Offer of Vendors. Submission of Technical Bid Evaluation for Vendor Offers. (TBE)